A full-size prototype of a Micromegas precision tracking chamber for the upgrade of the ATLAS detector at the LHC Collider has been built between October 2015 and April 2016. This paper describes in detail the procedures followed in the construction of the components of the chamber in various INFN laboratories and the final assembly in the Laboratori Nazionali di Frascati (LNF). In addition, the results of the chamber exposure to a particle beam at SPS/H8 at CERN in June 2016 are presented. The performances obtained in the construction and the results of the test beam are compared with the requirements set in order to sustain the high radiation levels expected during the data-taking of the LHC in the next years.
Construction techniques and performances of a full-size prototype Micromegas chamber for the ATLAS muon spectrometer upgrade
Gorini, E.;Gravili, F.;Mirto, A.;
2020-01-01
Abstract
A full-size prototype of a Micromegas precision tracking chamber for the upgrade of the ATLAS detector at the LHC Collider has been built between October 2015 and April 2016. This paper describes in detail the procedures followed in the construction of the components of the chamber in various INFN laboratories and the final assembly in the Laboratori Nazionali di Frascati (LNF). In addition, the results of the chamber exposure to a particle beam at SPS/H8 at CERN in June 2016 are presented. The performances obtained in the construction and the results of the test beam are compared with the requirements set in order to sustain the high radiation levels expected during the data-taking of the LHC in the next years.File | Dimensione | Formato | |
---|---|---|---|
Micromega2020.pdf
solo utenti autorizzati
Descrizione: Articolo
Tipologia:
Versione editoriale
Licenza:
NON PUBBLICO - Accesso privato/ristretto
Dimensione
5.75 MB
Formato
Adobe PDF
|
5.75 MB | Adobe PDF | Visualizza/Apri Richiedi una copia |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.